Changeset 1059


Ignore:
Timestamp:
Aug 6, 2012 11:15:26 AM (11 years ago)
Author:
jemian
Message:

starting to rearrange

Location:
cssboy_deployment/docs/source
Files:
4 added
3 edited

Legend:

Unmodified
Added
Removed
  • cssboy_deployment/docs/source/conf.py

    r1053 r1059  
    110110# A shorter title for the navigation bar.  Default is the same as html_title.
    111111#html_short_title = None
     112html_short_title = 'CSS-BOY Deployment at APS'
    112113
    113114# The name of an image file (relative to this directory) to place at the top
  • cssboy_deployment/docs/source/index.rst

    • Property svn:keywords changed from Author Date Id Rev Url to Author Date Id Revision URL
    r1058 r1059  
    77---------
    88
    9 APS beam lines will deploy this software expecting to
    10 use standard screens from the APS, as well as
    11 locally-produced screens.  Each beam line will need to
    12 install identical customizations at several beam line
    13 workstations.   The APS will need occasionally to update
    14 the suite of standard screens.
     9:index:`! CSS-BOY` is graphical-user interface software for EPICS,
     10maintained and distributed by the SNS.  Separate executables are
     11provided for Windows, MacOS, and Linux operating systems.
     12It is intended to use CSS-BOY to replace :index:`MEDM` at APS beam lines.
     13
     14This document describes the steps to install and configure
     15CSS-BOY for use at APS beam lines.
    1516
    1617
     
    2021   :maxdepth: 2
    2122   
     23   layout
     24   install
     25   configure
     26   glossary
    2227   plans
    23    thoughts
    2428
    2529
  • cssboy_deployment/docs/source/plans.rst

    r870 r1059  
    55==========================
    66
    7 .. note:: This should be changed to reflect new
     7
     8APS beam lines will deploy CSS-BOY expecting to
     9use standard screens from the APS, as well as
     10locally-produced screens.  Each beam line will need to
     11install identical customizations at several beam line
     12workstations.   The APS will need occasionally to update
     13the suite of standard screens.
     14
     15
     16.. note:: These notes should be changed to reflect the new
    817   pattern discussed at 2012 EPICS Meeting
    918
     
    2837
    2938* documentation!
     39
     40
     41
     42Contents:
     43
     44.. toctree::
     45   :maxdepth: 2
     46   
     47   thoughts
Note: See TracChangeset for help on using the changeset viewer.